How a 180-Person EPC Contractor Cut Weekly Reporting from 12 Hours to 2
All Case Studies
EPC

How a 180-Person EPC Contractor Cut Weekly Reporting from 12 Hours to 2

A 180-person EPC contractor eliminated 10 hours of weekly manual reporting per project manager using AI-powered automation.

August 12, 2026Client: Mid-Tier EPC Contractor (Anonymised) 3 min read

THE OPERATING CHALLENGE

The client's project managers spent 10-12 hours every week compiling status reports from 4 different systems. Reports were consistently late, contained copy-paste errors, and consumed the most experienced PMs who should have been managing risk instead of formatting tables.

WHAT KRESTO IMPLEMENTED

Kresto deployed a three-phase automation: (1) data extraction layer pulling live data from Procore and SharePoint APIs, (2) AI-powered narrative generation that converts raw metrics into readable project commentary, (3) automated distribution via email and dashboard. Built in 6 weeks with zero disruption.

VERIFIED OUTCOME

Weekly reporting time dropped from 12 hours to under 2 hours per PM. Report accuracy improved from 85% to 99%+. The 3 senior PMs recovered 30 hours/week collectively. The client estimated $180,000 annual savings across the team.

Publication is subject to Kresto’s internal evidence and client-consent checks. The operating context and outcomes shown are specific to this study and are not a promise of equivalent results elsewhere.

Share this study:

Start with what is
actually slowing delivery.

Start with a free 30-minute Workflow Review to discuss the manual process, document bottleneck, or coordination overhead worth examining first.

Request a Workflow Review
Kresto

Practical AI workflow transformation for EPC, infrastructure, engineering, and project-based companies.

Workflow Review

Start with one workflow.

Request a free 30-minute Workflow Review to discuss the repeated reporting, document, or coordination work that is slowing delivery.

Request a Workflow Review →

A detailed assessment and AI Workflow Blueprint are separately scoped only where there is a clear fit.

Get Practical AI Insights

No fluff. Specific, actionable perspectives on AI workflow transformation for EPC, infrastructure, and engineering companies — delivered to your inbox.

No spam. Practical insights only. Unsubscribe anytime.

I agree to receive insights from Kresto Consulting and have read the Privacy Policy. Unsubscribe anytime.

© 2026 Kresto Consulting. All rights reserved.